• Skip to primary navigation
  • Skip to content
  • Skip to primary sidebar
  • Skip to footer

High Himalaya Hydro Construction Pvt. Ltd. (3HC)

Your Partner for Civil Construction Works for Hydro & Infrastructure Projects

Your Partner for Civil Construction Works for Hydro & Infrastructure Projects
  • Home
  • About Us
    • Vision, Mission & Objectives
    • Guiding Principles and Values
    • Quality Policy
    • Keys to Success
    • Promoters / Shareholders
    • Message from the Chairman
    • Message from the Managing Director
  • Services
  • Projects
  • Valued Clients
  • Contact Us

Khani Khola 1 Hydropower Project (25 MW) – Partly

Project Khani Khola 1 Hydropower Project (25 MW) – Part of Underground Civil Works
Location Dolakha District
Client Greenlife Energy Pvt. Ltd
Works
  • Main Access Tunnel (5.0m x 5.0m) 182m
  • Tailrace Tunnel (2.0m x 2.0m) 216m
  • Access Tunnel to Pressure Shaft (4 x 4m) 80m
  • Branch Portion of Pressure Shaft Tunnel attached to Powerhouse (2.2 x 2.2 m) 56m
Status Completed  in March 2013

Primary Sidebar

Ongoing Projects

  • Lower Likhu Hydropower Project (28.1 MW)
  • Mid Hill West (Pushpalal) Highway Project
  • Super Dordi Hydropower Project-Kha (49.6 MW)
  • Mistri Khola Hydroelectric Project (42 MW)
  • Rudi Khola A Small Hydropower Project (8.8 MW)
  • Rudi Khola B Small Hydropower Project (8.8 MW)

Completed Projects

  • Midim Khola (Karapu) Hydropower Project (3 MW)
  • Upper Mai ‘C’ Hydroelectric Project (5.1 MW)
  • Hewa Khola A Hydroelectric Project (15 MW)
  • Upper Mai Hydroelectric Project (10 MW)
  • Mai Cascade Hydropower Project (7 MW)
  • Siprin Khola Hydroelectric Project (10 MW)
  • Mailun Khola Hydropower Project (6 MW)
  • Upper Hugdi Small Hydropower Project (5 MW)
  • Tadi Khola Hydropower Project (5 MW)
  • Khani Khola 1 Hydropower Project (25 MW) - Partly
  • Budhi Gandaki Hydropower Project (1200 MW) – Test Adit Tunnels
  • Tanahu Hydropower Project (140 MW) – Test Adit Tunnels
  • RCC Bridge of Hewa Khola
  • Mid Hill West (Pushpalal) Highway Project in Jajarkot

Completed Repair Works of

  • Jhimruk Hydropower Plant (12 MW)
  • Siprin Khola Hydroelectric Project (10 MW)
  • Khimti I Hydropower Plant (60 MW)
  • Indrawati III Hydroelectric Project (7.5 MW)
  • Khudi Hydropower Project (4 MW)
  • Chaku Hydropower Project (3 MW)

Find Us on Facebook

Footer

High Himalaya Hydro Construction Pvt. Ltd. (3HC)
Lalitpur-3, Dhobighat
Post Box No. 12637, Kathmandu
Nepal

Tel: +977 1 5552905, 5546520, 5551546
Fax: +977 1 5551546

email: [email protected] & [email protected]

Your Partner for Civil Construction Works for Hydro & Infrastructure Projects.

Contact us for:

Hydropower
Tunnelling
Transmission Line
Irrigation, Water and Wastewater Management
Ropeway/Cable Car
Road and Bridges
Survey and Design
Fabrication Works
Equipment Rental and Maintenance

Copyright ©2018 · High Himalaya Hydro Construction Pvt. Ltd. (3HC) · All Rights Reserved ·