Mistri Khola Hydroelectric Project (42 MW)
Project Mistri Khola Hydro Electric Project (42 MW) – All Civil Works Location Myagdi District Client Robust Energy Ltd. Works Headworks with a 24m high dam Two radial gates for bed load flushing and a frontal intake Two underground settling basins (100m x 8.5m x 12.75m) Inverted D shaped (4m dia) 2130 m long headrace tunnel … Continue reading Mistri Khola Hydroelectric Project (42 MW)