Upper Mai ‘C’ Hydroelectric Project (5.1 MW)
Project Upper Mai ‘C’ Hydroelectric Project (5.1 MW) – All Civil Works Location Ilam District Client Panchakanya Mai Hydropower Limited (Former Mai Valley Hydropower Pvt. Ltd.) Works Headworks Headrace Tunnel 2.0m x 2.0m (975.6m) Powerhouse Status Completed in July 2017
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed